Concrete log deck and bucking area. Not that this covers two 17 x 24 pages.

 

  The concrete drawings are color-coded for the depth of concrete. The imbedment types in the concrete are color coded, also. These are steel plates imbeded in the concrete with steel J-bolts welded to the plates. After the concret is poured, machinery and equipment is welded to the plates.  

  The orange bars are steel wide-flange I-shapes, with holes cut in the webs. Steel rebar is laid in the floor before the concrete is poured and is fed through these holes in the wide-flange shapes. When the concrete is set, these make a very solid mounting surface.  

     